Skip to content

Materials and project resources

From material construction and physical samples to installation, acceptance and maintenance, find existing HUAGE materials by project stage. Brochure records can be traced directly to the relevant dimensions, wear layer and finish descriptions.

Inside the board

Distinguish construction first, then compare board format and pattern

Generic construction diagram; timber colour and thickness proportions are indicative. Actual layers, species and dimensions are confirmed for each product.

Construction and specifications

How to Read a Wood Flooring Specification Sheet: Dimensions, Wear Layer & Core

When comparing flooring specifications, name, length, width, overall thickness, wear layer, construction and treatment need to correspond to the same product and configuration. Checking samples and quotations against a complete set of figures reduces the ambiguity of deciding from a single thickness or pattern.

How to Specify Full-Birch Multi-Layer Engineered Wood Flooring

Full birch describes the core; European white oak and similar describe the face. Using the brochure parameters for Champs-Élysées as an example, this explains how overall thickness, wear-layer thickness, surface treatment and project selection should each be confirmed for engineered wood flooring.

3-Layer Engineered Wood Flooring Construction: Face, Core & Balancing Layer

Three-layer engineered timber consists of a solid timber top layer, a solid timber core and a veneer balancing layer. The description of the construction should be kept separate from the specifications of a particular product; when selecting, record the species, the thickness of each layer, the jointing method, the surface treatment and the installation conditions in the same product document.

Species, appearance and surface

ABC vs ABCD Wood Flooring Grades: Appearance, Knots & Sample Approval

ABC and ABCD in the original HUAGE brochure are appearance grading groups for the face layer, covering knot information; they are not environmental grades. Selection should be based on the specific product, the combined samples and the acceptable range of board faces, with construction and performance documents checked separately.

Hand-Scraped, Cross-Sanded vs Brushed Oak Flooring: Comparing Surface Textures

The same European white oak top layer can feel different depending on the specific surface treatment. Using Champs-Élysées, Camilla and Chloe as examples, Huage distinguishes hand-scraped or blunt-blade, cross-sanded and brushed finishes, and explains how to compare physical samples and confirm specifications.

Black Walnut vs White Oak vs Mixed-Timber Parquet: Comparing Face Veneers

In the Huage catalogue, Dorothy uses North American black walnut, Svita uses European white oak, and A21 combines North American black walnut with Canadian maple. Comparisons should be based on the actual samples, grain and appearance when laid out; species, colour variation or price should not be treated directly as a ranking of quality.

Board format, pattern and setting out

Specifying Bespoke Shaped Parquet: Unit Geometry, Room Layout & Edge Details

Lotus-leaf and other shaped parquet designs form a floor composition through their outlines and how they combine. Huage uses A28 and A29 in the catalogue as application references, and sets out the plank shapes, materials, dimensions, orientation, boundaries and sample content to be confirmed before bespoke production.

Applications and details

Can Timber Flooring Be Used on Walls? Substrate Fixing & Edge Detailing Guide

The Huage catalogue explicitly covers wall applications for Oak Grey and Oak Classic Black. Wall selection requires checking the flooring appearance separately from the wall construction, together with the substrate, fixing, corners, sockets and door-frame details; not all flooring should automatically be treated as wall panelling.

Specifying Wood Veneer Ceilings: Coordinating Lighting, MEP Services & Access

Selecting a timber veneer ceiling involves considering the surface, board joints, lighting, services and maintenance together. Using the ceiling application photographs supplied by Huage as a reference, this explains how material and construction should meet, and does not substitute the photographs for species, fixing or fire performance data.

How to Detail Timber Stair Treads: Nosings, Riser Heights & Landing Junctions

Timber veneer for stairs should start from checking the finished level of the whole flight, then confirming treads, nosings, risers and landings. Using the catalogue applications as a reference, Huage explains how drawings, fixing, slip-resistance requirements and the material schedule should be coordinated, and does not infer grade or thickness from photographs.

Traditional, Recessed, Minimal & Shadow-Gap Skirting Details for Wood Floors

Skirting is a matching component; a skirting-free detail is a junction method involving the wall and floor construction. Following the forms in the catalogue, Huage explains the differences between traditional, recessed, minimal and skirting-free details, and sets out the coordination points for door frames, stone, corners and movement allowance.

Quotations, site and delivery

Quality, underfloor heating and maintenance

What Does ENF Formaldehyde Grading Mean on Wood Flooring Test Reports?

ENF is a formaldehyde emission class under China's GB/T 39600-2021. For some styles listed in HUAGE brochures, read the label and the product test documents separately: check the model, the manufacturing entity, the batch, the method and whether the report is complete. Do not interpret the label as zero formaldehyde or as a global certification.

Is Wood Flooring Suitable for Underfloor Heating? Product & System Checklist

Selecting a floor for underfloor heating requires checking the specific floor, substrate, ancillary materials, thermal performance data and operating conditions. A structural name or the thickness of the wear layer does not on its own determine suitability; the limits of use and responsibilities should be set out in the project documents.

Brochure records

First confirm the specific model, construction and sample, then check pricing, installation and delivery scope. Current supply configurations are subject to written confirmation for the project.

  • Champs-Élysées · A-03

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 1900 × 190 mm; thickness 16 mm

  • Rebecca · A-04

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 1900 × 190 mm; thickness 16 mm

  • Camilla · A-05

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 1900 × 190 mm; thickness 16 mm

  • Chloe · A-06

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 1900 × 190 mm; thickness 16 mm

  • Zoe · A-07

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 1900 × 190 mm; thickness 16 mm

  • Chantilly · A-09

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Guri · A-10

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Black Gentleman · A-11

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Camellia · A-12

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Athena · A-13

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Silver Snow Grass · A-14

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Cloud Sea Rime · A-15

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — 2400 × 300 mm; wear layer 4.0 mm; overall thickness to be confirmed (brochure chapter page gives 19 mm, detail page gives 16 mm; the two are inconsistent).

  • Dorothy · A-17

    Construction — multi-layer engineered · Species as listed — North American black walnut · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Elizabeth · A-18

    Construction — multi-layer engineered · Species as listed — North American black walnut · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Sveta · A-19

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Valo · A-20

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Nordic Geometric Walnut & Maple Parquet · A-21

    Construction — multi-layer engineered · Species as listed — North American black walnut + Canadian maple · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order); official product name to be confirmed.

  • Black Suit · A-22

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Lysandra · A-23

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Niafi · A-24

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Vivica · A-25

    Construction — multi-layer engineered · Species as listed — European white oak · Dimensions as listed — overall board size: 800 × 800 mm; thickness 18 mm (other sizes available to order)

  • Shaped Lotus Leaf parquet flooring · A-28

    Construction — not stated in the original brochure · Species as listed — not provided · Dimensions as listed — not provided

  • Shaped parquet flooring · A-29

    Construction — not stated in the original brochure · Species as listed — not provided · Dimensions as listed — not provided

  • White Snow No. 1 · PDF-13

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 1210 × 190 × 15 × 3.0 mm; 2210 × 240 × 16 × 4.0 mm

  • Smoked Oak · PDF-14

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 1210 × 190 × 15 × 1.2 mm; 1210 × 190 × 15 × 3.0 mm; 1910 × 190 × 15 × 3.0 mm

  • Linen Oak · PDF-15

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 1210 × 190 × 15 × 1.2 mm; 1210 × 190 × 15 × 3.0 mm; 2200 × 240 × 16 × 4.0 mm

  • Grey Oak · PDF-16

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 1210 × 190 × 15 × 1.2 mm; 1210 × 190 × 15 × 3.0 mm; 2210 × 240 × 16 × 4.0 mm

  • Cream White Oak · PDF-17

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 1210 × 190 × 15 × 1.2 mm; 1210 × 190 × 15 × 3.0 mm; 1910 × 190 × 15 × 3.0 mm

  • Mid-Century Oak · PDF-18

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 610 × 55 × 16 × 4.0 mm

  • Oak Classic Black · PDF-19

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 610 × 55 × 16 × 4.0 mm

  • French Style Oak No. 1 · PDF-20

    Construction — multi-layer engineered · Species as listed — oak · Dimensions as listed — 510 × 92 × 15 × 3.0 mm

  • American Black Walnut Herringbone · PDF-21

    Construction — multi-layer engineered · Species as listed — American black walnut · Dimensions as listed — 610 × 95 × 15 × 1.2 mm; 610 × 95 × 15 × 3.0 mm

  • Light Black Walnut Chevron · PDF-22

    Construction — multi-layer engineered · Species as listed — American black walnut · Dimensions as listed — 500 × 90 × 15 × 3.0 mm

  • American Black Walnut · PDF-23

    Construction — multi-layer engineered · Species as listed — American black walnut · Dimensions as listed — 1910 × 190 × 15 × 3.0 mm

  • Burmese Teak No. 1 · PDF-24

    Construction — multi-layer engineered · Species as listed — teak · Dimensions as listed — 1210 × 190 × 15 × 3.0 mm

  • Burmese Teak No. 2 · PDF-25

    Construction — solid wood · Species as listed — teak · Dimensions as listed — 910 × 125 × 18 mm

  • Malacca Summer · PDF-26

    Construction — solid wood · Species as listed — acacia · Dimensions as listed — 910 × 125 × 18 mm

  • Sabah Dream Snow · PDF-27

    Construction — solid wood · Species as listed — acacia · Dimensions as listed — 910 × 125 × 18 mm

Spatial reference

Project requirements

Get to know HUAGE, a China-based wood flooring supplier. Browse materials by application — floors, walls, ceilings, stairs and matching trims — and check board format, laying pattern, construction and supply arrangements for UK projects separately.