American Black Walnut Herringbone, original HUAGE catalogue material
Original product catalogue materials · American Black Walnut Herringbone

Herringbone flooring

A staggered pattern of rectangular, square-ended boards

Herringbone staggers rectangles into a continuous rhythm, identified by square-ended connections. This section gathers confirmed catalogue flooring, pattern and product records for herringbone.

Application groups

Floor products

Material selection dimensions

Laying patterns

Document scope

Original catalogue and project references

Pattern and construction are different dimensions. After selecting herringbone, confirm dimensions, solid or engineered construction, finish and actual installation separately.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

American Black Walnut Herringbone

PDF-21 · Original PDF Catalogue · Page 21

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Herringbone
Material construction
Multi-ply engineered wood
Recorded species
American Black Walnut
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*95*15*1.2mm 610*95*15*3.0mm
Solid wood top layer
610×95×15mm: top layer 1.2mm; 610×95×15mm: top layer 3.0mm
Original catalogue style and grain
Vintage, elegant tones suited to American, Chinese and other interior styles

Shabamengxue

PDF-27 · Original PDF Catalogue · Page 27

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Herringbone
Material construction
Solid wood
Recorded species
Acacia
Recorded core
Not stated in the original catalogue
Recorded specifications
910*125*18mm
Original catalogue style and grain
A preferred choice for Chinese-style interiors; slightly interlocked grain, sometimes wavy

More original catalogue information