Grey Oak, HUAGE original catalogue materials
Original product catalogue materials · Grey Oak

Wall panels and timber finishes

Interior wall cladding and outdoor applications presented separately

Wall references separate indoor panelling, timber finishes and outdoor vertical use. Explicit wall-use catalogue records appear with their corresponding images here.

Application groups

Wall applications

Material selection dimensions

Application area

Document scope

Original catalogue and project references

Outdoor screening photographs are separate application references showing material-space relationships. They do not replace provenance, outdoor-performance or installation-system documents. Confirm suitable materials and connections for the project.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

Grey Oak

PDF-16 · Original PDF Catalogue · Page 16

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors, walls
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*1.2mm 1210*190*15*3.0mm 2210*240*16*4.0mm
Solid wood top layer
1210×190×15mm: top layer 1.2mm; 2210×240×16mm: top layer 4.0mm; 1210×190×15mm: top layer 3.0mm
Original catalogue colour tones
Light grey tones
Original catalogue style and grain
Give the space greater composure

Classic Black Oak

PDF-19 · Original PDF Catalogue · Page 19

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors, walls
Board format
Straight boards
Laying pattern
Original interior image as a herringbone layout reference; confirm the specific pattern for the project
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*55*16*4.0mm
Solid wood top layer
4.0mm
Original catalogue style and grain
Classic Black Oak creates an elegant, composed foundation for an interior

More original catalogue information

Outdoor vertical-application references

Customer-supplied outdoor-screening photographs are separate application references for material-space discussions. Confirm provenance, outdoor performance and installation systems separately.