Burmese Teak No. 2, original HUAGE catalogue material
Original product catalogue materials · Burmese Teak No. 2

Solid wood flooring

The construction dimension of a single piece of wood

Solid wood is a construction category, separate from three-layer or multi-ply construction. Named catalogue records can also have straight-board formats or laying references such as herringbone.

Application groups

Floor products

Material selection dimensions

Material construction

Document scope

Original catalogue and project references

Confirm species, actual dimensions, finish and project conditions separately. Original catalogue records trace material references; current supply and local installation requirements need individual confirmation.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

Burmese Teak No. 2

PDF-25 · Original PDF Catalogue · Page 25

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Solid wood
Recorded species
Teak
Recorded core
Not stated in the original catalogue
Recorded specifications
910*125*18mm
Original catalogue style and grain
A preferred choice for Chinese-style interiors; warm feel and distinctive grain

Malashengxia

PDF-26 · Original PDF Catalogue · Page 26

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Solid wood
Recorded species
Acacia
Recorded core
Not stated in the original catalogue
Recorded specifications
910*125*18mm
Original catalogue colour tones
Glossy brown
Original catalogue style and grain
A preferred choice for Chinese-style interiors

Shabamengxue

PDF-27 · Original PDF Catalogue · Page 27

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Herringbone
Material construction
Solid wood
Recorded species
Acacia
Recorded core
Not stated in the original catalogue
Recorded specifications
910*125*18mm
Original catalogue style and grain
A preferred choice for Chinese-style interiors; slightly interlocked grain, sometimes wavy

More original catalogue information