Mid-century Oak, HUAGE original catalogue materials
Original product catalogue materials · Mid-century Oak

Narrow-board flooring

A finer straight-board format

Narrow boards concern format and scale. Original oak strip records provide colour and surface references; specify pattern, construction and application separately. Narrow boards can also form herringbone and other patterns. The product interior images here show herringbone references, with format and pattern selected separately.

Application groups

Floor products

Material selection dimensions

Board format and scale

Document scope

Original catalogue and project references

When comparing narrow boards, consider board width, visible joints, room proportions and furniture scale together. Catalogue images support material discussions; current supply dimensions and finish are governed by the confirmed project documents.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

Mid-century Oak

PDF-18 · Original PDF Catalogue · Page 18

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Original interior image as a herringbone layout reference; confirm the specific pattern for the project
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*55*16*4.0mm
Solid wood top layer
4.0mm
Original catalogue style and grain
A preferred option for French vintage interiors; narrow-edge mid-century-style flooring

Classic Black Oak

PDF-19 · Original PDF Catalogue · Page 19

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors, walls
Board format
Straight boards
Laying pattern
Original interior image as a herringbone layout reference; confirm the specific pattern for the project
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*55*16*4.0mm
Solid wood top layer
4.0mm
Original catalogue style and grain
Classic Black Oak creates an elegant, composed foundation for an interior