Original product catalogue materials · French-style Oak No. 1Chevron flooring
A continuous V formed by angled board ends
Chevron joins angled ends into V-shaped lines, distinct from herringbone's staggered rectangular boards. Original pattern and interior references are organised by the installation patterns actually visible.
Application groups
Floor products
Material selection dimensions
Laying patterns
Document scope
Original catalogue and project references
Original HUAGE catalogue material
The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.
List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.
French-style Oak No. 1
PDF-20 · Original PDF Catalogue · Page 20
Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.
- Application area
- Floors
- Board format
- Angled-end boards
- Laying pattern
- Chevron
- Material construction
- Multi-ply engineered wood
- Recorded species
- Oak
- Recorded core
- All-birch plywood core (origin not stated)
- Recorded specifications
- 510*92*15*3.0mm
- Solid wood top layer
- 3.0mm
- Original catalogue colour tones
- A hint of pink within a light natural wood tone
- Original catalogue style and grain
- A softer, elegant space suited to restrained French-style interiors



Light Black Walnut Chevron
PDF-22 · Original PDF Catalogue · Page 22
Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.
- Application area
- Floors
- Board format
- Angled-end boards
- Laying pattern
- Chevron
- Material construction
- Multi-ply engineered wood
- Recorded species
- American Black Walnut
- Recorded core
- All-birch plywood core (origin not stated)
- Recorded specifications
- 500*90*15*3.0mm
- Solid wood top layer
- 3.0mm
- Original catalogue colour tones
- Light-coloured black walnut
- Original catalogue style and grain
- Suited to individual home interior styles



More original catalogue information




Next category
Next category
Prepare project requirements information
