Dorothy, original HUAGE catalogue material
Original product catalogue materials · Dorothy

Bespoke parquet flooring

Select materials around the pattern composition

Bespoke parquet considers module shape, grain direction, tone and combinations. Catalogue display names locate the corresponding records; construction and laying patterns may overlap with other topics.

Application groups

Floor products

Material selection dimensions

Laying patterns

Document scope

Original catalogue and project references

Bring pattern references, plan dimensions and edge locations to discuss modules. Images do not replace colour samples or detail approval. Confirm current dimensions, construction and finishes per project.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

Dorothy

A-17 · Original Catalogue A · Page 17

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Elizabeth

A-18 · Original Catalogue A · Page 18

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Sveta

A-19 · Original Catalogue A · Page 19

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Valo

A-20 · Original Catalogue A · Page 20

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Swedish Belle matching design

A-21 · Original Catalogue A · Page 21

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut + Canadian maple
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised); formal public product name awaiting confirmation.
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Black Suit

A-22 · Original Catalogue A · Page 22

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Lysandra

A-23 · Original Catalogue A · Page 23

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Niyafei

A-24 · Original Catalogue A · Page 24

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Vivica

A-25 · Original Catalogue A · Page 25

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Lotus-leaf shaped parquet flooring

A-28 · Original Catalogue A · Page 28

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Shaped units
Laying pattern
Shaped parquet
Material construction
Not stated in the original catalogue
Recorded species
Not provided
Recorded core
Not stated in the original catalogue
Recorded specifications
Not provided

Shaped parquet flooring

A-29 · Original Catalogue A · Page 29

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Shaped units
Laying pattern
Shaped parquet
Material construction
Not stated in the original catalogue
Recorded species
Not provided
Recorded core
Not stated in the original catalogue
Recorded specifications
Not provided

More original catalogue information

Next category