Champs-Élysées, HUAGE original catalogue materials
Original product catalogue materials · Champs-Élysées

Multi-ply engineered wood flooring

Describe the solid wood top layer and multi-ply core separately

For multi-ply engineered wood flooring, record face timber, solid wood top layer, core and overall thickness separately. Catalogue straight-board, narrow-board and parquet records may overlap under this construction topic.

Application groups

Floor products

Material selection dimensions

Material construction

Document scope

Original catalogue and project references

For UK bespoke engineered flooring, HUAGE offers a solid wood wear-layer selection range of 3.0–4.0 mm. This means the top wood layer, not overall board thickness, and does not apply automatically to every historical catalogue record. Project discussions should confirm current supplied construction, top layer, dimensions and use conditions separately, defining responsibilities for materials and local installation.

Original HUAGE catalogue material

The images below follow original catalogue display records. Names help retrieve information and are not current supply models or stock commitments. Confirm project dimensions, construction, solid wood top layers, finishes and delivery arrangements individually.

List top-layer and overall thickness separately. Appearance groups describe catalogue selection; environmental grades are labels for the relevant designs. Confirm current supply and test documents separately.

Champs-Élysées

A-03 · Original Catalogue A · Page 3

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 1900*190 mm / thickness 16 mm
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Hand-scraped / blunt-tool finish
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Rebecca

A-04 · Original Catalogue A · Page 4

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 1900*190 mm / thickness 16 mm
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Hand-scraped / blunt-tool finish
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Original catalogue board samples

Camilla

A-05 · Original Catalogue A · Page 5

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 1900*190 mm / thickness 16 mm
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Cross-sanded texture
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Original catalogue board samples

Chloe

A-06 · Original Catalogue A · Page 6

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 1900*190 mm / thickness 16 mm
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Brushed finish
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Original catalogue board samples

Zoe

A-07 · Original Catalogue A · Page 7

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 1900*190 mm / thickness 16 mm
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Brushed finish
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Original catalogue board samples

Xiangti

A-09 · Original Catalogue A · Page 9

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Guli

A-10 · Original Catalogue A · Page 10

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Black Gentleman

A-11 · Original Catalogue A · Page 11

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Camellia

A-12 · Original Catalogue A · Page 12

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Athena

A-13 · Original Catalogue A · Page 13

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Silver Snow Grass

A-14 · Original Catalogue A · Page 14

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Yunhai Wusong

A-15 · Original Catalogue A · Page 15

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
2400 × 300 mm; top layer 4.0 mm; overall thickness to be confirmed (the catalogue chapter page states 19 mm, while the detail page states 16 mm).
Solid wood top layer
4.0mm
Original catalogue wood selection
ABCD (with knots)
Original catalogue processing
Italian water-based coating, entirely handmade
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Dorothy

A-17 · Original Catalogue A · Page 17

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Elizabeth

A-18 · Original Catalogue A · Page 18

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Sveta

A-19 · Original Catalogue A · Page 19

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Valo

A-20 · Original Catalogue A · Page 20

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Swedish Belle matching design

A-21 · Original Catalogue A · Page 21

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
North American black walnut + Canadian maple
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised); formal public product name awaiting confirmation.
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Black Suit

A-22 · Original Catalogue A · Page 22

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Lysandra

A-23 · Original Catalogue A · Page 23

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Niyafei

A-24 · Original Catalogue A · Page 24

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Vivica

A-25 · Original Catalogue A · Page 25

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Modular parquet
Laying pattern
Modular parquet
Material construction
Multi-ply engineered wood
Recorded species
European white oak
Recorded core
Russian all-birch plywood core
Recorded specifications
Overall board dimensions: 800*800 mm / thickness 18 mm (other dimensions can be customised)
Solid wood top layer
3.0mm
Original catalogue wood selection
ABC (with knots)
Original catalogue processing
9 primer coats + 2 topcoats
Environmental labels in the original catalogue
ENF class (formaldehyde emissions ≤0.025 mg/m³)

Baixue No. 1

PDF-13 · Original PDF Catalogue · Page 13

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*3.0mm 2210*240*16*4.0mm
Solid wood top layer
1210×190×15mm: top layer 3.0mm; 2210×240×16mm: top layer 4.0mm
Original catalogue colour tones
Ivory tones
Original catalogue style and grain
Suited to light-coloured contemporary minimalist interiors

Smoked Oak

PDF-14 · Original PDF Catalogue · Page 14

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*1.2mm 1210*190*15*3.0mm 1910*190*15*3.0mm
Solid wood top layer
1210×190×15mm: top layer 1.2mm; 1910×190×15mm: top layer 3.0mm; 1210×190×15mm: top layer 3.0mm
Original catalogue colour tones
Coffee tones
Original catalogue style and grain
Suited to contemporary minimalist interiors

Fabric-textured Oak

PDF-15 · Original PDF Catalogue · Page 15

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*1.2mm 1210*190*15*3.0mm 2200*240*16*4.0mm
Solid wood top layer
1210×190×15mm: top layer 1.2mm; 2200×240×16mm: top layer 4.0mm; 1210×190×15mm: top layer 3.0mm
Original catalogue style and grain
A fabric-like texture adds movement to the space

Grey Oak

PDF-16 · Original PDF Catalogue · Page 16

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors, walls
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*1.2mm 1210*190*15*3.0mm 2210*240*16*4.0mm
Solid wood top layer
1210×190×15mm: top layer 1.2mm; 2210×240×16mm: top layer 4.0mm; 1210×190×15mm: top layer 3.0mm
Original catalogue colour tones
Light grey tones
Original catalogue style and grain
Give the space greater composure

Cream White Oak

PDF-17 · Original PDF Catalogue · Page 17

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*1.2mm 1210*190*15*3.0mm 1910*190*15*3.0mm
Solid wood top layer
1210×190×15mm: top layer 1.2mm; 1910×190×15mm: top layer 3.0mm; 1210×190×15mm: top layer 3.0mm
Original catalogue colour tones
Cream-white tones
Original catalogue style and grain
Coordinates with modern French and modern minimalist styles

Mid-century Oak

PDF-18 · Original PDF Catalogue · Page 18

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Original interior image as a herringbone layout reference; confirm the specific pattern for the project
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*55*16*4.0mm
Solid wood top layer
4.0mm
Original catalogue style and grain
A preferred option for French vintage interiors; narrow-edge mid-century-style flooring

Classic Black Oak

PDF-19 · Original PDF Catalogue · Page 19

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors, walls
Board format
Straight boards
Laying pattern
Original interior image as a herringbone layout reference; confirm the specific pattern for the project
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*55*16*4.0mm
Solid wood top layer
4.0mm
Original catalogue style and grain
Classic Black Oak creates an elegant, composed foundation for an interior

French-style Oak No. 1

PDF-20 · Original PDF Catalogue · Page 20

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Angled-end boards
Laying pattern
Chevron
Material construction
Multi-ply engineered wood
Recorded species
Oak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
510*92*15*3.0mm
Solid wood top layer
3.0mm
Original catalogue colour tones
A hint of pink within a light natural wood tone
Original catalogue style and grain
A softer, elegant space suited to restrained French-style interiors

American Black Walnut Herringbone

PDF-21 · Original PDF Catalogue · Page 21

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Herringbone
Material construction
Multi-ply engineered wood
Recorded species
American Black Walnut
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
610*95*15*1.2mm 610*95*15*3.0mm
Solid wood top layer
610×95×15mm: top layer 1.2mm; 610×95×15mm: top layer 3.0mm
Original catalogue style and grain
Vintage, elegant tones suited to American, Chinese and other interior styles

Light Black Walnut Chevron

PDF-22 · Original PDF Catalogue · Page 22

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Angled-end boards
Laying pattern
Chevron
Material construction
Multi-ply engineered wood
Recorded species
American Black Walnut
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
500*90*15*3.0mm
Solid wood top layer
3.0mm
Original catalogue colour tones
Light-coloured black walnut
Original catalogue style and grain
Suited to individual home interior styles

American Black Walnut

PDF-23 · Original PDF Catalogue · Page 23

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
American Black Walnut
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1910*190*15*3.0mm
Solid wood top layer
3.0mm
Original catalogue style and grain
Vintage palatial style; traditional Chinese style

Burmese Teak No. 1

PDF-24 · Original PDF Catalogue · Page 24

Original catalogue version information; confirm current UK project specifications and delivery arrangements separately.

Application area
Floors
Board format
Straight boards
Laying pattern
Straight-board installation reference
Material construction
Multi-ply engineered wood
Recorded species
Teak
Recorded core
All-birch plywood core (origin not stated)
Recorded specifications
1210*190*15*3.0mm
Solid wood top layer
3.0mm
Original catalogue style and grain
A preferred choice for Chinese-style interiors

Original catalogue board samples

More original catalogue information