Selected Timber Flooring & Parquet Project Archives
18 documented residential floor installations supplied in China (130–360 m²). Spatial visuals illustrate timber tone and laying geometry; schedules reflect original archive data.
360 m² Multi-Format Penthouse — UpperHills, Shenzhen
Timber Palette: Oak (4 Coordinated Finishes)
360 m² Dual-Species Residence — Oriental Rose Garden, Shenzhen
Timber Palette: Solid Teak & Multi-Layer Black Walnut
360 m² Solid Teak Residence — Donghai Garden, Shenzhen
Timber Palette: 18 mm Solid Teak (Long-Term Archive)
360 m² Dual-Hardwood Residence — Qianhai Bay CEO Residence (Ref. 32)
Timber Palette: Solid Oak & Solid Black Walnut
300 m² Engineered Teak Residence — Vanke Fifth Garden, Shenzhen
Timber Palette: Teak on Full-Birch Multi-Layer Core
300 m² Full-Birch Oak Residence — Qianhai Bay CEO Residence (Ref. 34)
Timber Palette: European Oak on Full-Birch Core
300 m² Black Walnut Residence — Yicheng Qiwanli, Shenzhen
Timber Palette: Black Walnut on Full-Birch Core
240 m² Character-Knot Oak Residence — Shentie Yifu, Shenzhen
Timber Palette: Knotty European Oak Multi-Layer
150 m² Coastal-Bay Oak Residence — Zhuoyue Qianshuiwan, Shenzhen
Timber Palette: European Oak Full-Birch Multi-Layer
150 m² Waterfront Oak Residence — Nanhai Rose Garden, Shenzhen
Timber Palette: European Oak Full-Birch Multi-Layer
140 m² Warm Oak Apartment — Jinxiu Garden, Shenzhen
Timber Palette: European Oak Full-Birch Multi-Layer
130 m² Solid Teak Residence — Huifang Garden, Shenzhen
Timber Palette: 18 mm Solid Teak
130 m² Black Walnut Apartment — Jiabaorun Golden Plaza, Shenzhen
Timber Palette: Black Walnut Full-Birch Multi-Layer
White-Teak Solid Timber Residence — Longyueshan, Shenzhen
Timber Palette: Solid Timber (Listed as White Teak)
Contemporary Multi-Layer Oak Residence — Guihua Yuan, Futian
Timber Palette: European Oak Full-Birch Multi-Layer
Hillside Engineered Oak Residence — Tianyu Xiangshan, Shenzhen
Timber Palette: European Oak Full-Birch Multi-Layer
10-Year Solid Teak Archive — Mingcui Valley, Shenzhen
Timber Palette: 18 mm Solid Teak (Installed 2015)
Minimalist Multi-Layer Oak Residence — Yuanxing Ju, Shenzhen
Timber Palette: European Oak Full-Birch Multi-Layer
Share your floor plan or finish schedule for 7–10 day physical control samples
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).