Qianhai Bay CEO Residence · Record 32 interior wood flooring reference photograph

Qianhai Bay CEO Residence · Record 32

Interior flooring application of solid oak / solid black walnut. The materials state an installation date of October 2024.

Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of solid oak / solid black walnut. The spatial photographs and material descriptions correspond to page 32 of the original material.

Recorded region

China

Recorded products

Solid oak / solid black walnut

Recorded installation date

October 2024

Recorded area

360 m²

HUAGE-supplied China project reference image

The original materials state an installation date of October 2024 and an area of 360 m².

Another record with the same project name appears in the original materials. Its materials, area and installation month differ, so both records are retained separately.

HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.

Back to project records