Jiabaorun Jinzuo interior wood flooring reference photograph

Jiabaorun Jinzuo

Interior flooring application of black walnut engineered flooring with an all-birch plywood core. The materials state an installation date of March 2025.

Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of black walnut engineered flooring with an all-birch plywood core. The spatial photographs and material descriptions correspond to page 41 of the original material.

Recorded region

China

Recorded products

Black walnut engineered flooring with an all-birch plywood core

Recorded installation date

March 2025

Recorded area

130 m²

HUAGE-supplied China project reference image

The original materials state an installation date of March 2025 and an area of 130 m².

HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.

Back to project records