Jinxiu Garden interior wood flooring reference photograph

Jinxiu Garden

Interior flooring application of oak with an all-birch plywood core. The materials state an installation date of September 2025.

Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of oak engineered flooring with an all-birch plywood core. The spatial photographs and material descriptions correspond to page 39 of the original material.

Recorded region

China

Recorded products

Oak with an all-birch plywood core

Recorded installation date

September 2025

Recorded area

140 m²

HUAGE-supplied China project reference image

The original materials state an installation date of September 2025 and an area of 140 m².

HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.

Back to project records