The original materials state an installation date of November 2024 and an area of 300 m².

Yicheng Qiwanli
Interior flooring application of black walnut engineered flooring with an all-birch plywood core. The materials state an installation date of November 2024.
Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of black walnut engineered flooring with an all-birch plywood core. The spatial photographs and material descriptions correspond to page 35 of the original material.
Recorded region
China
Recorded products
Black walnut engineered flooring with an all-birch plywood core
Recorded installation date
November 2024
Recorded area
300 m²
HUAGE-supplied China project reference image





HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.
Back to project recordsNext project record
Next project record
Prepare your project requirements with material references and dimensions to generate a local checklist.
