Interior wood flooring record photograph, Shentie Yifu

Shentie Yifu

Interior flooring application of oak with an all-birch plywood core, with knots. The materials state an installation date of January 2025.

Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of knotted oak engineered flooring with an all-birch plywood core. The spatial photographs and material descriptions correspond to page 36 of the original material.

Recorded region

China

Recorded products

Oak with an all-birch plywood core, with knots

Recorded installation date

January 2025

Recorded area

240 m²

HUAGE-supplied China project reference image

The original materials state an installation date of January 2025 and an area of 240 m².

HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.

Back to project records