The original materials state an installation date of October 2025 and an area of 360 m².
This record lists four product names and photographs showing wood colours and finishes. This page does not infer each product's construction from its name.

Interior flooring application of Baixue No. 1 / Fabric-textured Oak; French-style Oak No. 1 / Classic Black Oak. The materials state an installation date of October 2025.
Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of Baixue No. 1 / Fabric-textured Oak; French-style Oak No. 1 / Classic Black Oak. The spatial photographs and material descriptions correspond to page 29 of the original material.
China
Baixue No. 1 / Fabric-textured Oak; French-style Oak No. 1 / Classic Black Oak
October 2025
360 m²
HUAGE-supplied China project reference image
The original materials state an installation date of October 2025 and an area of 360 m².
This record lists four product names and photographs showing wood colours and finishes. This page does not infer each product's construction from its name.





HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.
Back to project recordsPrepare your project requirements with material references and dimensions to generate a local checklist.