The original materials state an installation date of December 2024 and an area of 360 m².

Oriental Rose Garden
Interior flooring application of solid teak / black walnut with an all-birch plywood core. The materials state an installation date of December 2024.
Compiled from project materials supplied by HUAGE, this page shows the interior flooring application of solid teak / black walnut engineered flooring with an all-birch plywood core. The spatial photographs and material descriptions correspond to page 30 of the original material.
Recorded region
China
Recorded products
Solid teak / black walnut with an all-birch plywood core
Recorded installation date
December 2024
Recorded area
360 m²
HUAGE-supplied China project reference image






HUAGE-supplied China project reference image. This page describes flooring materials only, not other pictured finishes or furniture.
Back to project recordsNext project record
Next project record
Prepare your project requirements with material references and dimensions to generate a local checklist.
