Hover for interior
Custom plank proportions, bespoke stain/gloss matching (10–45 GU) and batch-matched continuity across floors, walls, ceilings, stairs and shadow-gap skirtings.
Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
P01 | 1210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Compact urban apartments, bedrooms & UFH zones |
P02 | 1910 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Standard full-home continuous straight plank |
P03 | 2210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended-length architectural plank |
P04 | 2210 × 240 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Wide-format open-plan living & hotel suites |
P05 | 2210 × 260 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Large-format lateral apartments & villas |
P06 | 2400 × 260 × 15 / 19 mm* | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Long wide plank (*confirm 15 vs 19 mm per width rule) |
P07 | 2400 × 300 × 19 mm | 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Flagship extra-wide villa, gallery & lobby plank |
P08 | 1200 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Classic narrow strip for heritage & Parisian interiors |
P09 | 1900 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended narrow-strip linear corridor & salon board |
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
H01 | 610 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Fine-scale classic European townhouse herringbone |
H02 | 610 × 93 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Balanced residential reception & bedroom proportion |
H03 | 610 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Contemporary wider-block residential herringbone |
H04 | 760 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Mid-large hospitality, club & gallery herringbone |
H05 | 760 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Wide architectural herringbone for open-plan bays |
H06 | 910 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Elongated grand herringbone with reduced end-joints |
H07 | 910 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Flagship villa & boutique ballroom herringbone |
H08 | 910 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Oversized architectural statement herringbone |
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
C01 | 510 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Delicate Parisian Haussmann-scale chevron (45°/60°) |
C02 | 510 × 95 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Standard residential salon & dining axis chevron |
C03 | 510 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Contemporary wide-bay apartment chevron |
C04 | 680 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Large-scale hotel lounge & penthouse chevron |
C05 | 680 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Generous wide-stave architectural chevron |
C06 | 780 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Grand villa & flagship retail gallery chevron |
C07 | 780 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Monumental reception hall chevron |
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
A01 | 450 × 450 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Compact modular parquet for studies & corridors |
A02 | 600 × 600 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Medium residential salon & boutique suite module |
A03 | 800 × 800 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Standard Versailles & catalogue marquetry module |
A04 | 900 × 900 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Large-span villa reception & dining hall module |
A05 | 1000 × 1000 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Grand palace, hotel lobby & majlis statement panel |
AB, ABC, ABCD, CDE and CDEF describe visual knot frequency and surface hand-working—not structural strength or emission classes.
Minimal pin knots, calm uniform grain and zero open defects. Popular in 1910 × 190 mm planks with fine wire-brushing in ivory, warm white or raw oak tones for minimalist apartments.
Authentic filled sound knots, organic grain movement and reactive smoked or medium-embossed finishes (typical 2400 × 240 × 15 × 4.0 mm) suited to 150 m²+ residences and boutique hotels.
Expressive large knots, hand-scraped undulations and 15° low-sheen Italian water-based finishes on flagship 2400 × 300 × 19 × 4.0 mm wide boards for villas and art galleries.
Precision CNC marquetry combining oak, black walnut, maple or teak with calibrated jade (10+8 mm), mother-of-pearl shell or pure copper inlays for grand foyers and suites.
Hover for interior
Hover for interior
Hover for interior
Hover for interior
Hover for interior
Hover for interior
Hover for interior
Finish elevations, soffits and staircases from the same approved timber colour batch.
Hover for interior
Hover for interior
Hover for interior
Hover for interior
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).
Custom colour & texture control samples prepared in 7–10 days.