HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-P21 · UFH Ready

American Black Walnut — Classic 90° Herringbone

American Black Walnut — Classic 90° Herringbone (HG-P21) is a documented HUAGE catalogue specification combining american black walnut (select walnut grade) with full-birch multi-layer engineered construction. Standard archive dimensions: 610 × 95 × 15 mm (1.2 mm / 3.0 mm wear layer; H01–H08 custom sizes) (1.2 mm / 3.0 mm solid black walnut). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.

Specification Code
HG-P21
Timber Species
American Black Walnut
Appearance Grade
Select Walnut Grade
Core Construction
Full-Birch Multi-Layer Engineered
Standard Format
610 × 95 × 15 mm (1.2 mm / 3.0 mm wear layer; H01–H08 custom sizes)
Wear Layer
1.2 mm / 3.0 mm solid black walnut
Surface & Coating
Dedicated A/B handed T&G grooves · Silky low-sheen protective finish
Underfloor Heating
Suitable for hydronic underfloor heating (max floor surface ≤ 27 °C; staged pre-heating required)
Documentation Note
Ideal for reception rooms, boutique clubs & heritage apartments

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
H01610 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakFine-scale classic European townhouse herringbone
H02610 × 93 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakBalanced residential reception & bedroom proportion
H03610 × 125 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakContemporary wider-block residential herringbone
H04760 × 125 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakMid-large hospitality, club & gallery herringbone
H05760 × 155 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakWide architectural herringbone for open-plan bays
H06910 × 125 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakElongated grand herringbone with reduced end-joints
H07910 × 155 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakFlagship villa & boutique ballroom herringbone
H08910 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakOversized architectural statement herringbone
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).