Hover for interior
Dorothy — 800 mm Starburst Black Walnut Parquet (HG-A17) is a documented HUAGE catalogue specification combining american black walnut (abc select character grade) with multi-layer engineered parquet construction. Standard archive dimensions: 800 × 800 × 18 mm (450–1000 mm custom modules) (3.0 mm solid walnut (4.0 mm custom option)). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.
HG-A17Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.
Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
A01 | 450 × 450 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Compact modular parquet for studies & corridors |
A02 | 600 × 600 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Medium residential salon & boutique suite module |
A03 | 800 × 800 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Standard Versailles & catalogue marquetry module |
A04 | 900 × 900 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Large-span villa reception & dining hall module |
A05 | 1000 × 1000 × 15 / 18 mm | 3.0 / 4.0 / 5.0 mm | Oak / Walnut / Teak / Inlay | Grand palace, hotel lobby & majlis statement panel |
Hover for interior
Hover for interior
Hover for interior
Hover for interior
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).
Custom colour & texture control samples prepared in 7–10 days.