HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-ART-04 · Ambient Subfloor

Pure Copper Inlay Geometric Wood Parquet

Architectural parquet panels integrating fine pure copper linear inlays with dark walnut, smoked oak or teak—delivering crisp geometric rhythm and seamless coordination with metal doorway thresholds.

Specification Code
HG-ART-04
Timber Species
Black Walnut / Oak / Teak + Metallic Copper Strips
Appearance Grade
Bespoke Metallic-Timber Marquetry
Core Construction
Multi-Layer Engineered Marquetry Module
Standard Format
450² to 1000² mm custom modules (15 / 18 mm build-up)
Wear Layer
3.0 mm – 4.0 mm solid hardwood + flush anti-oxidation copper trim
Surface & Coating
Flush-calibrated metallic inlay · Sealed anti-tarnish protective coat
Underfloor Heating
Confirm ambient humidity & subfloor build-up; not recommended over high-temperature radiant UFH
Documentation Note
Confirm metallic profile width, chamfer tolerance & indoor UFH limits per drawing

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
P011210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakCompact urban apartments, bedrooms & UFH zones
P021910 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakStandard full-home continuous straight plank
P032210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended-length architectural plank
P042210 × 240 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakWide-format open-plan living & hotel suites
P052210 × 260 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLarge-format lateral apartments & villas
P062400 × 260 × 15 / 19 mm*3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLong wide plank (*confirm 15 vs 19 mm per width rule)
P072400 × 300 × 19 mm4.0 / 5.0 mmOak / Black Walnut / TeakFlagship extra-wide villa, gallery & lobby plank
P081200 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakClassic narrow strip for heritage & Parisian interiors
P091900 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended narrow-strip linear corridor & salon board
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).