HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-A28 · Ambient Subfloor

Lotus-Leaf — Curved Radial Shaped Parquet

Lotus-Leaf — Curved Radial Shaped Parquet (HG-A28) is a documented HUAGE catalogue specification combining custom species per cad schedule (oak / walnut / teak) (bespoke pattern selection) with cnc bespoke engineered module construction. Standard archive dimensions: Custom module geometry per room CAD setting-out (Confirmed per bespoke project schedule). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.

Specification Code
HG-A28
Timber Species
Custom Species per CAD Schedule (Oak / Walnut / Teak)
Appearance Grade
Bespoke Pattern Selection
Core Construction
CNC Bespoke Engineered Module
Standard Format
Custom module geometry per room CAD setting-out
Wear Layer
Confirmed per bespoke project schedule
Surface & Coating
Precision CNC curved milling · Custom sheen 10–45 GU
Underfloor Heating
Confirm ambient humidity & subfloor build-up; not recommended over high-temperature radiant UFH
Documentation Note
Confirmed per selected substrate & project order specification

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
A01450 × 450 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayCompact modular parquet for studies & corridors
A02600 × 600 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayMedium residential salon & boutique suite module
A03800 × 800 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayStandard Versailles & catalogue marquetry module
A04900 × 900 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayLarge-span villa reception & dining hall module
A051000 × 1000 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayGrand palace, hotel lobby & majlis statement panel
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).