Hover for interior
Extend approved floor timber tones continuously onto feature walls, concealed flush doors, soffits and decorative false beams. Engineered for stable elevation fixing in coordination with linear lighting, HVAC diffusers and access hatches.
HG-SYS-WCExport supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.
Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
P01 | 1210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Compact urban apartments, bedrooms & UFH zones |
P02 | 1910 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Standard full-home continuous straight plank |
P03 | 2210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended-length architectural plank |
P04 | 2210 × 240 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Wide-format open-plan living & hotel suites |
P05 | 2210 × 260 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Large-format lateral apartments & villas |
P06 | 2400 × 260 × 15 / 19 mm* | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Long wide plank (*confirm 15 vs 19 mm per width rule) |
P07 | 2400 × 300 × 19 mm | 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Flagship extra-wide villa, gallery & lobby plank |
P08 | 1200 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Classic narrow strip for heritage & Parisian interiors |
P09 | 1900 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended narrow-strip linear corridor & salon board |
Hover for interior
Hover for interior
Hover for interior
Hover for interior
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).
Custom colour & texture control samples prepared in 7–10 days.