HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-ART-03 · Ambient Subfloor

Mother-of-Pearl Shell Inlay Artistic Parquet

Hand-set mother-of-pearl shell accents inlaid into CNC-routed black walnut or oak parquet modules and sealed beneath crystal-clear water-based polyurethane for galleries, dressing salons and bespoke hospitality suites.

Specification Code
HG-ART-03
Timber Species
Black Walnut / Oak / Teak + Mother-of-Pearl Shell
Appearance Grade
Bespoke Marquetry Grade
Core Construction
Multi-Layer Engineered Marquetry Module
Standard Format
450×450, 600×600, 800×800, 900×900, 1000×1000 × 15 / 18 mm
Wear Layer
3.0 mm – 5.0 mm hardwood with flush shell inlay
Surface & Coating
Clear water-based polyurethane protective encapsulate · pH-neutral care only
Underfloor Heating
Confirm ambient humidity & subfloor build-up; not recommended over high-temperature radiant UFH
Documentation Note
Indoor controlled-humidity spaces only; avoid abrasive pads, acids or solvents

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
P011210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakCompact urban apartments, bedrooms & UFH zones
P021910 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakStandard full-home continuous straight plank
P032210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended-length architectural plank
P042210 × 240 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakWide-format open-plan living & hotel suites
P052210 × 260 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLarge-format lateral apartments & villas
P062400 × 260 × 15 / 19 mm*3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLong wide plank (*confirm 15 vs 19 mm per width rule)
P072400 × 300 × 19 mm4.0 / 5.0 mmOak / Black Walnut / TeakFlagship extra-wide villa, gallery & lobby plank
P081200 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakClassic narrow strip for heritage & Parisian interiors
P091900 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended narrow-strip linear corridor & salon board
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).