HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-A21 · UFH Ready

Nordic Geometric — Walnut & Canadian Maple Marquetry

Nordic Geometric — Walnut & Canadian Maple Marquetry (HG-A21) is a documented HUAGE catalogue specification combining american black walnut + canadian maple (abc select marquetry grade) with multi-layer engineered parquet construction. Standard archive dimensions: 800 × 800 × 18 mm (custom modules available) (3.0 mm dual-species hardwood). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.

Specification Code
HG-A21
Timber Species
American Black Walnut + Canadian Maple
Appearance Grade
ABC Select Marquetry Grade
Core Construction
Multi-Layer Engineered Parquet
Standard Format
800 × 800 × 18 mm (custom modules available)
Wear Layer
3.0 mm dual-species hardwood
Surface & Coating
9 base coats + 2 topcoats precision marquetry seal
Underfloor Heating
Suitable for hydronic underfloor heating (max floor surface ≤ 27 °C; staged pre-heating required)
Documentation Note
Catalogue lists GB/T 39600 ENF; verify batch test documentation

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
A01450 × 450 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayCompact modular parquet for studies & corridors
A02600 × 600 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayMedium residential salon & boutique suite module
A03800 × 800 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayStandard Versailles & catalogue marquetry module
A04900 × 900 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayLarge-span villa reception & dining hall module
A051000 × 1000 × 15 / 18 mm3.0 / 4.0 / 5.0 mmOak / Walnut / Teak / InlayGrand palace, hotel lobby & majlis statement panel
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).