Hover for interior
French Style No. 1 — Warm Blush Oak Chevron (HG-P20) is a documented HUAGE catalogue specification combining oak (select chevron grade) with full-birch multi-layer engineered construction. Standard archive dimensions: 510 × 92 × 15 mm (C01–C07 custom sizes up to 780 × 190 mm) (3.0 mm solid oak (4.0 / 5.0 mm custom)). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.
HG-P20Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.
Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
C01 | 510 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Delicate Parisian Haussmann-scale chevron (45°/60°) |
C02 | 510 × 95 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Standard residential salon & dining axis chevron |
C03 | 510 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Contemporary wide-bay apartment chevron |
C04 | 680 × 125 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Large-scale hotel lounge & penthouse chevron |
C05 | 680 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Generous wide-stave architectural chevron |
C06 | 780 × 155 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Grand villa & flagship retail gallery chevron |
C07 | 780 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Monumental reception hall chevron |
Hover for interior
Hover for interior
Hover for interior
Hover for interior
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).
Custom colour & texture control samples prepared in 7–10 days.