HUAGE Flooring HUAGE Architectural Timber · Shenzhen
HG-P17 · UFH Ready

Cream White Oak — Parisian Pale Minimalist Plank

Cream White Oak — Parisian Pale Minimalist Plank (HG-P17) is a documented HUAGE catalogue specification combining oak (clean select appearance) with full-birch multi-layer engineered construction. Standard archive dimensions: 1210 × 190 × 15 mm (1.2 / 3.0 mm) · 1910 × 190 × 15 mm (3.0 mm) (1.2 mm / 3.0 mm solid oak). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.

Specification Code
HG-P17
Timber Species
Oak
Appearance Grade
Clean Select Appearance
Core Construction
Full-Birch Multi-Layer Engineered
Standard Format
1210 × 190 × 15 mm (1.2 / 3.0 mm) · 1910 × 190 × 15 mm (3.0 mm)
Wear Layer
1.2 mm / 3.0 mm solid oak
Surface & Coating
Ultra-matt cream wash preserving delicate oak medullary rays
Underfloor Heating
Suitable for hydronic underfloor heating (max floor surface ≤ 27 °C; staged pre-heating required)
Documentation Note
Batch test report verified per order specification

Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.

Custom Engineering Matrix

Available Bespoke Dimensions in This Format Family

Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.

CodeDimensions (L × W × H)Wear LayerSpeciesSpatial Scale
P011210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakCompact urban apartments, bedrooms & UFH zones
P021910 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakStandard full-home continuous straight plank
P032210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended-length architectural plank
P042210 × 240 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakWide-format open-plan living & hotel suites
P052210 × 260 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLarge-format lateral apartments & villas
P062400 × 260 × 15 / 19 mm*3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakLong wide plank (*confirm 15 vs 19 mm per width rule)
P072400 × 300 × 19 mm4.0 / 5.0 mmOak / Black Walnut / TeakFlagship extra-wide villa, gallery & lobby plank
P081200 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakClassic narrow strip for heritage & Parisian interiors
P091900 × 75 × 15 mm3.0 / 4.0 / 5.0 mmOak / Black Walnut / TeakExtended narrow-strip linear corridor & salon board
Collections

Comparable Timber Specifications

All 48 Specifications →
Project Specification & Sampling

Share your floor plan or finish schedule for 7–10 day physical control samples

HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).