Hover for interior
Linen-Textured Oak — Tactile Fabric-Grain Plank (HG-P15) is a documented HUAGE catalogue specification combining oak (clean architectural selection) with full-birch multi-layer engineered construction. Standard archive dimensions: 1210 × 190 × 15 mm (1.2 / 3.0 mm) · 2200 × 240 × 16 mm (4.0 mm) (1.2 mm / 3.0 mm / 4.0 mm solid oak). Custom dimensions, gloss levels (10–45 GU) and physical control samples are prepared in 7–10 days from our Shenzhen & Zhongshan facilities.
HG-P15Export supply partner (EXW / FOB / CIF) · 7–10 day physical control sampling · 200 m² custom production MOQ.
Confirm exact wear-layer thickness, T&G or click profile and sheen (10–45 GU) on your project schedule.
| Code | Dimensions (L × W × H) | Wear Layer | Species | Spatial Scale |
|---|---|---|---|---|
P01 | 1210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Compact urban apartments, bedrooms & UFH zones |
P02 | 1910 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Standard full-home continuous straight plank |
P03 | 2210 × 190 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended-length architectural plank |
P04 | 2210 × 240 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Wide-format open-plan living & hotel suites |
P05 | 2210 × 260 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Large-format lateral apartments & villas |
P06 | 2400 × 260 × 15 / 19 mm* | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Long wide plank (*confirm 15 vs 19 mm per width rule) |
P07 | 2400 × 300 × 19 mm | 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Flagship extra-wide villa, gallery & lobby plank |
P08 | 1200 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Classic narrow strip for heritage & Parisian interiors |
P09 | 1900 × 75 × 15 mm | 3.0 / 4.0 / 5.0 mm | Oak / Black Walnut / Teak | Extended narrow-strip linear corridor & salon board |
Hover for interior
Hover for interior
Hover for interior
Hover for interior
HUAGE manufactures engineered timber planks, herringbone/chevron parquet and coordinated wall, ceiling, stair and trim components in Shenzhen & Zhongshan (200 m² custom MOQ · EXW / FOB / CIF export supply).
Custom colour & texture control samples prepared in 7–10 days.