Trade and Supply
GTI Report: Brazil's timber index above 50% for third consecutive month in September 2026; wood-based panel index at 42.1%
The GTI report shows divergent wood sector performance across ten pilot countries in September 2026; Brazil's index stood at 55.3%, above 50% for the third consecutive month, while the GTI-Woodbased Panel Index was 42.1%.
International Tropical Timber OrganizationRead Full Article