HUAGE Flooring HUAGE Kayu Arsitektural · Shenzhen
HG-SYS-ST · Subfloor Kering

Anak Tangga Kayu, Nosing & Profil Plint Kustom

HG-SYS-ST · White Oak Eropa · Papan Lebar Lurus · Engineered Multi-Layer Full Birch · Step-by-step site schedule; Skirtings: 50 mm classic, 20–30 mm slim, recessed or shadow-gap · Matched hardwood wear face · Copper / Wood / Aluminium / Stainless transition trims White Oak Eropa.

Kode Spesifikasi
HG-SYS-ST
Spesies Kayu
White Oak Eropa
Grade Visual
Matched
Struktur Inti
Engineered Multi-Layer Full Birch
Format Standar
Step-by-step site schedule; Skirtings: 50 mm classic, 20–30 mm slim, recessed or shadow-gap
Lapisan Aus
Matched hardwood wear face · Copper / Wood / Aluminium / Stainless transition trims White Oak Eropa
Permukaan & Pelapis
10–45 GU · Papan Lebar Lurus · Engineered Multi-Layer Full Birch
Pemanas Lantai (UFH)
Konfirmasi kelembapan ruang dan struktur dasar; tidak disarankan di atas pemanas lantai bersuhu tinggi
Catatan Dokumentasi
Katalog mencantumkan GB/T 39600 ENF (≤ 0,025 mg/m³); konfirmasi laporan uji batch per pesanan.

Mitra pasokan ekspor (EXW / FOB / CIF) · Sampel kontrol fisik 7–10 hari · MOQ produksi kustom 200 m².

Matriks Dimensi Kustom

Format Kustom yang Tersedia dalam Keluarga Pola Ini

Konfirmasi ketebalan lapisan aus, profil T&G atau click serta tingkat kilap (10–45 GU) pada jadwal proyek Anda.

KodeDimensi (P × L × T)Lapisan AusSpesiesSkala Ruang
P011210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P021910 × 190 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P032210 × 190 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P042210 × 240 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P052210 × 260 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P062400 × 260 × 15 / 19 mm*3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P072400 × 300 × 19 mm4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P081200 × 75 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
P091900 × 75 × 15 mm3.0 / 4.0 / 5.0 mmWhite Oak Eropa / Black Walnut Amerika / Jati Burma (Teak)MOQ 200 m² · Sampel 7–10 Hari
Koleksi

Spesifikasi Kayu Pembanding

Semua 48 Spesifikasi →
Spesifikasi Proyek & Pengambilan Sampel

Bagikan denah atau jadwal finishing untuk sampel kontrol fisik dalam 7–10 hari

HUAGE memproduksi papan engineered, parket herringbone/chevron serta panel dinding, plafon, tangga dan trim serasi di Shenzhen & Zhongshan (MOQ kustom 200 m² · pasokan ekspor EXW / FOB / CIF).